Drop a folder or zip here
STEP and IGES files are read; everything else is ignored.
Your geometry is parsed and then deleted. Only the extracted numbers — gauge, cut length, bend count, mass — are kept.
Operations
Pick a part in the bill of materials to set how it gets made — the operations, the work centre each runs on, and the run and setup times.
| Part | Sourcing | Class | Material | Qty | Gauge | Mass ea. | Min ea. | Ready | Confidence | Cost ea. | Extended |
|---|
Corrections are keyed on geometry, so fixing a part here fixes it in every
job that part appears in. Costing and routing land in R5.